DIYASI is an underwear manufacturer in Yiwu, and this bra manufacturer enquiry route is for reviewing a proposed project before making a category commitment. The current published underwear catalogue does not establish a full bra size matrix or a tested support range. Send the intended bra type, cup and band approach, materials, measurements and support requirements for assessment. The underwear reference of 120 pieces per style is not a confirmed bra MOQ. Production capability, components, grading, testing, sample charges and schedule must be confirmed for this category. Use the checklist below to prepare an enquiry that can receive a meaningful feasibility response.
Capability requires confirmation. This page is a procurement assessment, not an offer of a verified production range for this category.
Decide how the size system will work
Start by identifying the bra type and how the range will be sized. A letter-size crop, a cup-and-band bra and an underwired style require different development questions. Provide the intended size coverage and the measurement definitions, then ask how the sample and grading proposal will be reviewed. A successful fit in one sample size does not validate the complete range. Do not copy an underwear size chart into a bra brief because both products use similar retail labels.
Treat components as a connected system
Cups, straps, underband, lining, closures and any hardware interact in the finished garment. Identify which components are specified by the buyer and which are proposed for review. Record attachment positions and adjustability requirements rather than relying on a front-view image. Ask about minimums and availability for the selected components before setting the assortment. If a substitute cup or elastic is proposed, review the resulting fit and support instead of accepting it as a cosmetic change.
Separate intended activity from verified support
For a sports-oriented brief, describe the activity and the intended wearer, then define how support and comfort will be assessed. A label such as high support is not established by the presence of padding or a wide strap. Keep sample observations and any formal test evidence distinct. Agree which versions and sizes need assessment and how a failed result changes the development plan. If the manufacturing team cannot confirm the requested construction or evidence, record that limitation before committing to launch photography, claims or stock.
Specifications to verify before sampling
| Specification | Published reference / confirmation needed |
|---|---|
| Category | Development assessment only; manufacturing capability must be confirmed |
| Fabric weight (gsm) | No verified model-specific weight published; request a measured specification |
| Colour and process | Confirm model-specific availability, dye/print method and approved colour reference; do not infer a stock colour count |
| Minimum quantity | Category-specific MOQ not established; written assessment required |
| Sampling | Category-specific schedule to be agreed after feasibility review |
| Bulk production | Category-specific production schedule not published |
MOQ and a comparable written quotation
A quantity reference describes the garment order, not an all-inclusive service package. Keep the sample fee, development work, labels, custom elastic, packing and freight visible as separate quotation questions. No verified price ladder is available for this page, so it does not publish invented unit costs or volume discounts. Ask for like-for-like quotations using the same specification and destination assumptions. For an assessment-only category, even the garment minimum remains open until the team confirms feasibility.
The website does not publish a verified unit-price ladder. Request your actual quantity and specification through the enquiry form; a quotation is required before making a cost or discount assumption.
Private-label components and their limits
DIYASI's existing private-label information lists waistband artwork, care labels, heat-transfer logos, hangtags and packaging as options for review. Each option must work with the selected construction and materials. Ask what can be retained from the source model and what changes require another sample or component purchase. The list is not a promise that every combination is available at the catalogue minimum. Approve placement, content and physical application; a brand file alone is not a complete manufacturing instruction.
| Component | Available review route | Approval boundary |
|---|---|---|
| Waistband | Custom artwork on a suitable selected style | Method, stretch, placement and component MOQ must be confirmed |
| Woven / care label | Submit artwork and destination requirements | No automatic certification, composition or legal claim |
| Heat-transfer logo | Review with the actual fabric and construction | Do not assume every material accepts the same process |
| Hangtag | Approve text, dimensions and attachment | Brand artwork rights and final information remain explicit |
| Bag / box / stickers | Review the requested packing format | Printed components may have a separate minimum and charge |
Quality checks and certification evidence
The published factory process describes incoming-material, inline-production and final checks. Use the approved measurements, construction, labels and packing instruction to define what those checks need to cover for your order. An AQL guide explains how a buyer can prepare an inspection plan; it is not a factory certificate or a universal acceptance threshold. No current certificate number or product-specific test report is asserted here. Request the relevant document, its validity and its product or facility scope before using a certification or performance claim.
Factory information and inspection stages · Prepare an AQL inspection and defect checklist
Six decisions from brief to dispatch
1. Define the project and its boundaries
Timing: Timing confirmed after brief review
Send the destination market, intended garment, model references and quantity by style. Separate confirmed requirements from questions that need the factory's response. Include the proposed size and colour allocation rather than only a total quantity. This gives the team a basis for identifying missing information, checking category feasibility and explaining which development or component decisions are still open. Keep the enquiry and its revisions together so a later quotation can be traced to the brief it actually answers.
2. Review materials and branded components
Timing: Availability and component schedule confirmed in the quotation
Compare the proposed composition, construction, colours and trims with the source model or technical specification. Review artwork, label information and packaging as separate inputs. Ask the team to identify any material substitution, component minimum or development charge before treating the proposal as accepted. A digital proof can settle artwork details but does not prove the feel or behaviour of a finished garment. Record the agreed material references and request a physical sample appropriate to the project.
3. Request and assess the sample
Timing: Catalogue reference 5–7 days; not a promise for unconfirmed categories or new development
Confirm when sampling begins and what the sample will represent. Review fit, finished measurements, construction, component composition and branding against the agreed brief. Note which details are final and which still need a revised sample or proof. Courier delivery and review rounds are separate from sample-making guidance. Use a dated comments record and retain the physical reference so the production decision is based on a specific version rather than a general impression from a photograph.
4. Approve the specification and commercial terms
Timing: Buyer and factory approval milestone; no fixed duration published
Reconcile the garment quantity with the size-by-colour grid, then confirm unit pricing and all separately charged items in writing. Identify the approved sample, artwork files, labels, packing method and delivery terms. Ask how changes or unavailable components will be handled after approval. Do not allow a missing measurement, unclear material description or unresolved category question to become an assumed manufacturing instruction. Both sides should be able to identify exactly which version has been released for production.
5. Produce and inspect against the approved record
Timing: Underwear reference 20–35 days, subject to quantity and customization; other categories require confirmation
Agree the production milestones and inspection scope for the actual order. Incoming material checks, inline checks and final inspection serve different purposes and should reference the same specification. If a defect, shade difference or packing issue is found, document the affected lot and the agreed action. A general process description is not proof that a particular batch passed. Request the records required by your purchasing procedure and keep them associated with the correct product and order version.
6. Confirm packing, dispatch and reorder information
Timing: Dispatch and transit quoted separately for the chosen route
Check final quantities, labels, carton markings and packing documents before dispatch. Confirm the delivery arrangement and which party is responsible for each transport step. Retain the approved sample and the final specification after shipment because they are useful references for any question about the received goods. A reorder still needs current availability, price and schedule confirmation. Use feedback by style and size to prepare that request instead of assuming that every earlier commercial or material condition remains unchanged.
Purchasing questions
Can I order a bra at the underwear catalogue MOQ?
Not on the basis of this page. Bra construction, sizing and component requirements need a separate capability, minimum-quantity and sampling review. The underwear catalogue reference is not a confirmed bra offer.
How is the sample schedule confirmed?
This category needs a feasibility review before a schedule can be confirmed. The underwear catalogue's 5–7 day sample guidance is not a promise for this proposed development. Confirm sample charges, revisions and courier time separately.
Are published unit prices or automatic quantity discounts available?
No verified unit-price ladder is published here. Request a written quotation identifying the style, composition, quantity, size and colour allocation, branding, packing and delivery terms. Ask for development, component and freight charges separately so offers can be compared on the same basis.
What payment and approval terms apply?
Request the current payment terms in your written quotation; no universal deposit percentage is stated here. Approve the physical sample, final specification, artwork, packing instruction and agreed schedule before authorising production. Use the existing contact form to submit the project brief.
Related manufacturing services
Lingerie Manufacturer for a Defined Underwear Range
Go deeper before requesting a quote
sports bra support levels small yoga brands
us eu underwear size labeling preparation startup brands
OEM / ODM process · Material information · Company identity and evidence
Specifications above come from the published DIYASI catalogue and company pages. They are supplier information, not an independent audit or a substitute for order-specific confirmation.